Bricks on the fourth floor and electrical work
09 Dec 2025
We have finished the partition walls on the fourth floor and are continuing with the atico-floor (last floor).
We started with the plumbing and electrical installations on the first floor.
09 Dec 2025
We have finished the partition walls on the fourth floor and are continuing with the atico-floor (last floor).
We started with the plumbing and electrical installations on the first floor.